We present you one of our jobs for Pluslog located in the Burzaco Industrial Park, Buenos Aires. A turnkey project, which responded to the needs raised by the client. It has a total area of 12,770 m2 distributed in a Cold Room: 7,224 m2, Empties: 1,896 m2. and Administration and services 3650 m2.
This project was conceived for the food industry.
Includes: Electrical substation and generating set. “Dry swamp” type effluent plant. Fire system with hydrant network.
Tags:
Buenos Aires / Cámara Frigorifica / grupo electrógeno / oficinas / pantano seco. Sistema de incendio / Parque Industrial de Burzaco / Planta de efluentes / red de hidrantes / Subestación eléctrica